RISK/OPERATIONS Screen
The Risk Assessment screen (below) is used to record general project information. This is particularly useful for managers, allowing them the facility to check the status of multiple projects at a glance.
Each risk assessment is based around a logical 3-tier system, which enables the project plan to be split into a manageable hierarchy and creates a reference path to each risk.
click image to enlarge
The 3-tiers in risk-elimin8 are -
- Operation
- Activity
- Risk.
Operation and Activity details are contained within the Operation screen (below). This screen can be used in two ways. Before the risk assessment, it can be used to create a project plan and during the risk assessment it can be used to reference exactly which part of the project the risk affects.